Monday, November 16, 2026 Search Subscribe
Carmel, covered daily

A Monterey Builder Lays Out the ADU Path for Carmel Homeowners, Step by Step

Palacios Construction, a licensed Monterey contractor, published a walk-through on Friday of how an accessory dwelling unit moves from a lot study to a final inspection in the Carmel area, at a moment when the city counts ADUs among the ways it expects to add 349 homes by 2031.

Rosebud Cottage in Carmel, its garage behind the iron gate. Garage conversions are one of the four ADU routes the Palacios walk-through lists, alongside detached and attached units and junior ADUs.
Rosebud Cottage in Carmel, its garage behind the iron gate. Garage conversions are one of the four ADU routes the Palacios walk-through lists, alongside detached and attached units and junior ADUs.
Gregory Ford Henderson, CC BY-SA 4.0 via Wikimedia Commons · Source

The questions arrive before the drawings do. In an announcement published on Friday, November 6, Palacios Construction, a licensed residential general contractor based in Monterey, set out the sequence it follows when a Carmel area homeowner wants to add an accessory dwelling unit, and the four worries it says owners raise first: how the lot is laid out, how local design review will treat the project, whether water is available, and who carries the permits.

Owner Christian Palacios describes owners who want a clear read on "what their property can realistically support" before any design work starts. The firm works across Monterey County, including Carmel-by-the-Sea, Carmel Valley and Pebble Beach, and builds detached and attached units, garage conversions and junior ADUs under California General Contractors License 1071780 B, according to the announcement and the firm's own site.

Bay Cottage, a single-story Carmel home behind its garden gate. The builder says the first step is a site evaluation of the lot, its setbacks, access and utilities, before any unit type is chosen.
Bay Cottage, a single-story Carmel home behind its garden gate. The builder says the first step is a site evaluation of the lot, its setbacks, access and utilities, before any unit type is chosen.
Gregory Ford Henderson, CC BY-SA 4.0 via Wikimedia Commons · Source

The walk-through begins on the ground rather than on paper. A site evaluation weighs the shape of the lot, its setbacks and access, the structures already standing and where utilities run, because those facts decide which kind of unit a property can hold. Only after that study does the firm settle the form the project will take: a freestanding backyard unit, an addition tied to the house, a converted garage, or a junior unit carved from inside the existing home.

Size is where state law and village practice meet, and the numbers need care. The announcement states that detached ADUs in Monterey County can reach 1,200 square feet under current state law, while cautioning that site conditions and local review may shrink what is practical on a given lot. The City of Carmel-by-the-Sea, in its own question and answer guide for owners considering an ADU, lists a maximum of 1,000 square feet for a detached ADU with two bedrooms, and a junior ADU capped at 500 square feet, contained inside the primary dwelling, with an efficiency kitchen and its own exterior entry. The two figures answer different questions, the state ceiling and the city's published table, and the announcement itself advises homeowners to verify specifics with their local building department.

Once a type is chosen, the announcement has the project move into permit-ready drawings: floor plans and elevations, plus structural, electrical, plumbing and mechanical layouts prepared for submission. Agency review follows, covering building department plan review, local design review where it applies, and a water-related review when new fixtures are added. Palacios says it manages that stage for its clients, coordinating submissions, answering plan check comments and scheduling inspections, a service its own ADU page also describes.

Two state timelines frame that stage on the firm's ADU page. Once a complete application is in, the reviewing agency has 60 days to respond under state law. And state law exempts ADUs under 750 square feet from impact fees, the page notes, a threshold that can shape how big an owner decides to build.

The Little Cottage of River Winds, a rustic wooden Carmel home with a stone chimney. Carmel counts ADUs among the ways it expects to add 349 homes by 2031, according to the city owner guide.
The Little Cottage of River Winds, a rustic wooden Carmel home with a stone chimney. Carmel counts ADUs among the ways it expects to add 349 homes by 2031, according to the city owner guide.
Gregory Ford Henderson, CC BY-SA 4.0 via Wikimedia Commons · Source

Construction then runs through site preparation, foundation and framing, rough plumbing and electrical work, insulation and finishes, with inspections at each stage. The sequence closes with final inspection approval and a document file the announcement says owners should keep for their records, and for resale and insurance purposes.

The guidance lands in a village that is actively counting small homes. Carmel-by-the-Sea is looking for opportunities to add 349 new housing units by 2031, as required by state law, and its owner guide presents ADUs as one option that blends new housing into existing neighborhoods, housing that the guide says could serve the local workforce and artists among others. Under the city's guide, a standard ADU is a complete independent home with its own exterior entry and no internal connection to the main house, a building permit is required, and applications go to the city's Building Safety Division.

None of that makes an ADU simple in a one-square-mile village with design traditions and coastal rules, which is the announcement's underlying point: the order of operations matters, and the lot study comes first.

Filed under:
  • Carmel-by-the-Sea
  • Carmel Valley
  • Pebble Beach
  • Accessory dwelling units
  • Housing
  • Permits
Carmel Tribune
Staff reports

Reporting from the Carmel Tribune.

Corrections
We correct errors promptly and note them here. Send corrections through the contact form on our contact page.

More from Real Estate

Rana Creek Ranch Estate Listed at $8.25 Million in Carmel Valley

The 160-acre estate carved out of the Wildlands Conservancy's 14,000-acre Rana Creek Preserve includes the 5,821-square-foot former Markkula residence. The conservancy is seeking a buyer who shares its conservation vision.

Carmel Tribune · Oct 11, 2026

"Gem Cove" Asks $49.5 Million Beside Pebble Beach's 18th Fairway

The 11,223-square-foot estate at 1494 Cypress Drive is one of the priciest active offerings on 17-Mile Drive, as Pebble Beach sales climb 26 percent.

Carmel Tribune · Oct 1, 2026

$1.8 Million in State Funding Targets Scenic Road Erosion at Carmel River Mouth

State Sen. John Laird announced $1.8 million for a protective structure on Scenic Road near the Carmel River mouth and lagoon.

Carmel Tribune · Sep 25, 2026
Read nextRana Creek Ranch Estate Listed at $8.25 Million in Carmel Valley
Carmel TribuneReal Estate